700 |
How can I change the shape of the task bar
With G2antt1 With .Chart.Bars.Copy("Task","T2") .StartShape = 2 .StartColor = RGB(255,0,0) End With .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001# End With End With |
699 |
How can I change the starting shape for all task bars
With G2antt1 With .Chart.Bars.Item("Task") .StartShape = 1 .StartColor = RGB(255,0,0) End With .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
698 |
How can I change the height of the task bar
With G2antt1 .Chart.Bars.Copy("Task","T2").Height = 17 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001# End With End With |
697 |
How can I change the height for all task bars
With G2antt1 .Chart.Bars.Item("Task").Height = 17 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
696 |
How can I change the color of the task bar
With G2antt1 .Chart.Bars.Copy("Task","T2").Color = RGB(255,0,0) .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001# End With End With |
695 |
How can I change the color for all task bars
With G2antt1 .Chart.Bars.Item("Task").Color = RGB(255,0,0) .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
694 |
How can I change the shape for all task bars
With G2antt1 .Chart.Bars.Item("Task").Shape = 4 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
693 |
How can I change the shape of the task bar
With G2antt1 .Chart.Bars.Copy("Task","T2").Shape = 19 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001# End With End With |
692 |
How can I change the pattern or style for all task bars
With G2antt1 .Chart.Bars.Item("Task").Pattern = 5 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
691 |
How can I change the pattern of the task bar
With G2antt1 .Chart.Bars.Copy("Task","T2").Pattern = 5 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001# End With End With |
690 |
How can I add a percent bar in the chart area, so the task bar is splited for non working days or hours
With G2antt1 .Columns.Add "Task" .Chart.Bars.Add("Task%Progress:Split").Shortcut = "TS" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"TS",#1/2/2001#,#1/16/2001#,"P1" .ItemBar(h,"P1",12) = 0.14 .ItemBar(h,"P1",14) = True End With End With |
689 |
How can I add a bar in the chart area, so the task bar is splited for non working days or hours
With G2antt1 .Columns.Add "Task" .Chart.Bars.Add("Task:Split").Shortcut = "TS" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"TS",#1/2/2001#,#1/16/2001# End With End With |
688 |
How can I add a split bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Split",#1/2/2001#,#1/6/2001# End With End With |
687 |
How can I add a progress bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Progress",#1/2/2001#,#1/6/2001# End With End With |
686 |
How can I add a milestone bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Milestone",#1/2/2001#,#1/2/2001# End With End With |
685 |
How can I add a summary bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Summary",#1/2/2001#,#1/6/2001# End With End With |
684 |
How can I add a project summary bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Project Summary",#1/2/2001#,#1/6/2001# End With End With |
683 |
How can I add a deadline bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Deadline",#1/2/2001#,#1/2/2001# End With End With |
682 |
How can I add a task bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
681 |
How can I assign a picture or an icon to a bar in the chart
With G2antt1 .HTMLPicture("p1") = "c:\exontrol\images\zipdisk.gif" .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .ItemHeight(h) = 48 .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = "<img>p1</img>" .ItemBar(h,"K1",4) = 2 End With End With |
680 |
How can I assign a picture or an icon to a bar in the chart
With G2antt1 .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = "<img>1</img>" End With End With |
679 |
How can I display or add an anchor or a hyperlink in the link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/1/2001#,#1/3/2001#,"K1" .AddItem "" .AddItem "" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "just <a1>link</a>" End With End With |
678 |
How can I display a picture or an icon on the link
With G2antt1 .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/1/2001#,#1/3/2001#,"K1" .AddItem "" .AddItem "" .AddItem "" .AddItem "" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "just <img>1</img> link" End With End With |
677 |
How can I display a picture or an icon on the link
With G2antt1 .HTMLPicture("pic1") = "c:\exontrol\images\zipdisk.gif" .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/1/2001#,#1/3/2001#,"K1" .AddItem "" .AddItem "" .AddItem "" .AddItem "" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "<img>pic1</img><br><br>just a link" End With End With |
676 |
How can I display some HTML text or caption on link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/1/2001#,#1/3/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "L<b>1</b>" End With End With |
675 |
How can I assign a tooltip to a link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/1/2001#,#1/3/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "L<b>1</b>" .Link("L1",13) = "This is a bit of text that's shown when the cursor hovers the link" End With End With |
674 |
Can I change the width or the size of the link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",9) = 0 .Link("L1",10) = 2 End With End With |
673 |
Can I change the style of the link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",9) = 4 End With End With |
672 |
Can I change the color of the link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",8) = 255 End With End With |
671 |
Can I change the part of the bar where the link ends
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",6) = 1 .Link("L1",7) = 1 End With End With |
670 |
Can I change the part of the bar where the link starts
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",6) = 0 End With End With |
669 |
How can I associate an extra data to a link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",5) = "your data" End With End With |
668 |
How can I show or hide a specified link
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",3) = False End With End With |
667 |
How can I get the key of the bar where the link end
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .AddItem .Link("L1",3) End With End With |
666 |
How can I get the key of the bar where the link starts
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .AddItem .Link("L1",1) End With End With |
665 |
How can I get the handle of the item where the link ends
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .AddItem .Link("L1",2) End With End With |
664 |
How can I get the handle of the item where the link starts
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .AddItem .Link("L1",0) End With End With |
663 |
How can I enumerate the links in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .AddLink "L2",h2,"K2",h1,"K1" .AddItem .FirstLink .AddItem .NextLink(.FirstLink) End With End With |
662 |
How can I access the properties and method of the link between two bars
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/1/2001#,#1/3/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "L<b>1</b>" End With End With |
661 |
How can I remove a link between two bars
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .ClearLinks End With End With |
660 |
How can I remove a link between two bars
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .RemoveLink "L1" End With End With |
659 |
How do I add a link between two bars
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With End With |
658 |
How do I ungroup the bars in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .GroupBars h1,"K1",True,h2,"K2",True .GroupBars h1,"K1",False,h2,"K2",False .UngroupBars h1,"K1",h2,"K2" End With End With |
657 |
How do I group one or more bars in the chart, so they are moved together
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .GroupBars h1,"K1",True,h2,"K2",True .GroupBars h1,"K1",False,h2,"K2",False End With End With |
656 |
How do I find the number or count of bars in the item
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/1/2001#,#1/2/2001#,"K1" .AddBar h,"Task",#1/4/2001#,#1/6/2001#,"K2" .ItemBar(h,"K2",3) = .ItemBar(h,"<*>",256) End With End With |
655 |
How can I assign any extra data to a bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",17) = "your data" End With End With |
654 |
How can I enable or disable resizing the percent value of a progress bar, at runtime
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.35 .ItemBar(h,"K1",16) = False End With End With |
653 |
Is there any way to change the background color for percent value being displayed on the progress bar
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.35 .ItemBar(h,"K1",14) = True .ItemBar(h,"K1",13) = "<bgcolor=FF0000> %p%</bgcolor>" End With End With |
652 |
Is there any way to change the color for percent value being displayed on the progress bar
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.35 .ItemBar(h,"K1",14) = True .ItemBar(h,"K1",13) = "<fgcolor=FF0000>%p%</fgcolor>" End With End With |
651 |
Is there any way to change the font for percent value being displayed on the progress bar
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.35 .ItemBar(h,"K1",14) = True .ItemBar(h,"K1",13) = "<b><font Tahoma;12>%%p</font></b>" End With End With |
650 |
How can I horizontally align the caption / percent of a progress-bar
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .LevelCount = 2 .PaneWidth(False) = 128 .FirstVisibleDate = #1/1/2001# With .Bars.Add("Task%Progress") .Shortcut = "Percent" .Def(14) = True .Def(12) = 1 End With End With With .Items h = .AddItem("Left") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",15) = 0 h = .AddItem("Center") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",15) = 1 h = .AddItem("Right") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",15) = 2 h = .AddItem("Left") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",15) = 0 .ItemBar(h,"K1",12) = 0.5 h = .AddItem("Center") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.5 .ItemBar(h,"K1",15) = 1 h = .AddItem("Right") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",15) = 2 .ItemBar(h,"K1",12) = 0.5 End With .EndUpdate End With |
649 |
Is there any way to change the format of the percent being displayed on the progress bar
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.4 .ItemBar(h,"K1",14) = True .ItemBar(h,"K1",13) = "<b>%p/100</b>" End With End With |
648 |
How can I show or hide the percent value in the progress bar
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.4 .ItemBar(h,"K1",14) = True End With End With |
647 |
How can I change the percent value in a progress bar
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar h,"Percent",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.4 End With End With |
646 |
How can I add a percent bar
' BarResize event - Occurs when a bar is moved or resized. Private Sub G2antt1_BarResize(ByVal Item As Long,ByVal Key As Variant) With G2antt1 Debug.Print( Key ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .LevelCount = 2 .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 64 With .Bars.Add("Task%Progress") .Shortcut = "P" .Def(14) = True End With End With With .Items h = .AddItem("Task 1") .AddBar h,"P",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.4 h = .AddItem("Task 2") .AddBar h,"Task%Progress",#1/2/2001#,#1/6/2001#,"K2" .ItemBar(h,"K2",12) = 0.15 End With .EndUpdate End With |
645 |
How can I fix or lock a specified bar at runtime, in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",10) = False .ItemBar(h,"K1",11) = False End With End With |
644 |
How can I enabled or disable moving a specified bar at runtime, in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",10) = False .ItemBar(h,"K1",11) = False End With End With |
643 |
How can I enabled or disable sizing a specified bar at runtime, in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",10) = False End With End With |
642 |
How can I change the key of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",9) = "NewK" .ItemBar(h,"NewK",3) = .ItemBar(h,"NewK",9) End With End With |
641 |
Can I add a bar in the chart, using your EBN files
With G2antt1 .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"",#1/2/2001#,#1/5/2001#,"K1"," EBN " .ItemBar(h,"K1",7) = 16777216 .AddBar h,"Task",#1/6/2001#,#1/8/2001#,"K2" End With End With |
640 |
How can I change the background color of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Copy("Task","TaskR").Color = RGB(255,0,0) With .Items h = .AddItem("Task 1") .AddBar h,"TaskR",#1/2/2001#,#1/6/2001#,"K1" End With End With |
639 |
How can I change the background color of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.ShowNonworkingDates = 0 With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",7) = 8421504 End With End With |
638 |
How can I change the background color of the HTML text or caption of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = "<bgcolor=FF0000> to do </bgcolor>" End With End With |
637 |
How can I change the foreground color of the HTML text or caption of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1","t<fgcolor=0000FF>o</fgcolor> do" .ItemBar(h,"K1",8) = 16777215 End With End With |
636 |
How can I change the foreground color of the HTML text or caption of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = "<bgcolor=FF0000> to do </bgcolor>" .ItemBar(h,"K1",8) = 16777215 End With End With |
635 |
How can I assign a tooltip to a bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ItemBar(h,"K1",6) = "This is a bit of text that's displayed when the cursor hovers the bar" End With End With |
634 |
How can I vertically align the HTML text or caption of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .ItemHeight(h) = 32 .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = "<bgcolor=FF0000> to do </bgcolor>" .ItemBar(h,"K1",5) = 0 End With End With |
633 |
How can I align the HTML text or caption of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = "<bgcolor=FF0000> to do </bgcolor>" .ItemBar(h,"K1",4) = 0 End With End With |
632 |
How can I assign a text or some HTML caption to a bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",3) = " <bgcolor=FF0000>to do</bgcolor> " End With End With |
631 |
How can I change the ending date of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ItemBar(h,"K1",2) = #1/6/2001# End With End With |
630 |
How can I change the starting date of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ItemBar(h,"K1",1) = #1/1/2001# End With End With |
629 |
How can I change the style or the name of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ItemBar(h,"K1",0) = "Progress" End With End With |
628 |
How can I access properties and methods of the bar in the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ItemBar(h,"K1",0) = "Progress" End With End With |
627 |
How can I remove all bars in the item
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ClearBars h End With End With |
626 |
How can I remove a bar from the chart
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .RemoveBar h,"K1" End With End With |
625 |
How can I add a bar and some text inside, in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/6/2001#,," to do " End With End With |
624 |
How can I add a bar and some text inside, in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/6/2001#,,"<bgcolor=FF0000> to do </bgcolor>" End With End With |
623 |
How can I add an anchor or a hyperline in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"",#1/2/2001#,#1/14/2001#,,"just a <a1>link</a>" End With End With |
622 |
How can I add some text or captions in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"",#1/2/2001#,#1/14/2001#,,"just a <b>caption</b>" End With End With |
621 |
How can I add a bar in the chart area
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/4/2001# End With End With |
620 |
Is there any option to put a picture or an icon to the thumb part of the scroll bar
With G2antt1 .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" .ScrollPartCaption(2,256) = "<img>1</img>" .ScrollThumbSize(2) = 24 End With |
619 |
How can I scroll fast the chart, or page by page
With G2antt1 .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" .ScrollHeight = 20 .ScrollButtonWidth = 20 .AllowChartScrollPage = True .ScrollPartCaption(2,2048) = "<img>1</img>" .ScrollPartCaption(2,32) = "<img>2</img>" End With |
618 |
How can I scroll fast the chart, or page by page
With G2antt1 .ScrollButtonWidth = 16 .AllowChartScrollPage = True .ScrollPartCaption(2,2048) = "<<" .ScrollPartCaption(2,32) = ">>" End With |
617 |
How can I scroll fast the chart, or page by page
With G2antt1 .AllowChartScrollPage = True End With |
616 |
How can I display years, from 3 to 3
With G2antt1 .Chart.UnitWidth = 64 With .Chart.Level(0) .Label = "<%yyyy%>" .Unit = 0 .Count = 3 End With End With |
615 |
How can I display years
With G2antt1 .Chart.UnitWidth = 64 With .Chart.Level(0) .Label = "<%yy%>" .Unit = 0 End With End With |
614 |
How can I display years
|
613 |
How can I display months, from 3 to 3
With G2antt1 .Chart.FirstVisibleDate = #1/1/2001# .Chart.LevelCount = 2 .Chart.UnitWidth = 64 .Chart.Level(0).Label = 1 With .Chart.Level(1) .Label = "<%mmmm%>" .Unit = 16 .Count = 3 End With End With |
612 |
How can I display months
With G2antt1 .Chart.UnitWidth = 64 .Chart.LevelCount = 2 .Chart.Level(0).Label = 1 With .Chart.Level(1) .Label = "<%mmmm%>/<%yy%>" .Unit = 16 End With End With |
611 |
How can I display months
With G2antt1 .Chart.LevelCount = 2 .Chart.UnitWidth = 64 .Chart.Level(0).Label = 1 .Chart.Level(1).Label = 16 End With |
610 |
How can I display weeks
With G2antt1 .Chart.LevelCount = 2 .Chart.UnitWidth = 64 .Chart.Level(0).Label = 17 .Chart.Level(1).Label = 256 End With |
609 |
How can I display weeks
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 17 .Chart.Level(1).Label = "<%ww%>" End With |
608 |
How can I display days, from 2 to 2
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 256 With .Chart.Level(1) .Label = "<%dd%>" .Count = 2 End With End With |
607 |
How can I display days
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 256 .Chart.Level(1).Label = "<%dd%>" End With |
606 |
How can I display days
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 256 .Chart.Level(1).Label = 4096 End With |
605 |
How can I display hours, from 6 to 6
With G2antt1 .Chart.FirstVisibleDate = "00:00" .Chart.LevelCount = 2 .Chart.Level(0).Label = 4096 With .Chart.Level(1) .Label = "<%hh%>" .Count = 6 End With End With |
604 |
How can I display hours
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 4096 .Chart.Level(1).Label = "<%hh%>" End With |
603 |
How can I display hours
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 4096 .Chart.Level(1).Label = 65536 End With |
602 |
How can I display minutes, from 15 to 15
With G2antt1 .Chart.FirstVisibleDate = "00:00" .Chart.LevelCount = 2 .Chart.Level(0).Label = 65536 With .Chart.Level(1) .Label = "<%nn%>" .Count = 15 End With End With |
601 |
How can I display minutes
With G2antt1 .Chart.LevelCount = 2 .Chart.Level(0).Label = 65536 .Chart.Level(1).Label = "<%nn%>" End With |